password

Wednesday, 18 November 2015

Month 1 Day 5


Inari attendance:
1. Alif (013-4063267)
2. Lokman (010-5614518)
3. EB Pang



Waftech attendance: (half day)
1. Wee Khang
2. Khai (016-5078149)

WAFTECH # 1
Progress:
1. Run Cu pillar, detected a bit crack due to cutting problem.
 
Old Pending:
1. Cutting offset detected after the conversion, no permanent position to lock the cutter position. Need to test and test every-time conversion. To optimize the cutting angle by product (2 days ago)

WAFTECH # 2
Progress:
1. Run 1 Cu pillar, observed small bubble.

WAFTECH # 3
Progress:
1. Replace & installed UV detaper motor to 360 degree (done)

Old Pending:
1. Alex to provide the timeline machine setup for waftech#3.(2 day ago)
 
 

No comments:

Post a Comment