Inari attendance:
1. Alif (013-4063267) - off, to do PM BACKGRIND#2
2. Lokman Trainee (010-5614518)
WAFTECH # 1
Progress:
WAFTECH # 3
Progress:
1. Install modified robot arm. Still have vacuum leak. The reading captured is -50kPa, the spec -90+/-10 Kpa. (done)
1. Alif (013-4063267) - off, to do PM BACKGRIND#2
2. Lokman Trainee (010-5614518)
Waftech attendance:
1. Chan Jr (018-9449917)
2. Khai (016-5078149)
2. Khai (016-5078149)
WAFTECH # 1
Progress:
1. Run 25 wafers Cu Pillar (done)
2. Compiling all data 10x3 and 25x3 wafers Cu Pad to send to BS Teoh (in progress)
WAFTECH # 2
Progress:
N/AProgress:
WAFTECH # 3
Progress:
1. Install modified robot arm. Still have vacuum leak. The reading captured is -50kPa, the spec -90+/-10 Kpa. (done)
Old Pending:
1. New robot arm need to modify due to fabrication error. Still have vacuum leak. -17 days ago
No comments:
Post a Comment