Day 23

Inari attendance:
1. Alif (013-4063267) - off, to do PM BACKGRIND#2
2. Lokman Trainee (010-5614518)



Waftech attendance:
1. Chan Jr (018-9449917)
2. Khai (016-5078149)

WAFTECH # 1
Progress:
1. Run 25 wafers Cu Pillar (done)
2. Compiling all data 10x3 and 25x3 wafers Cu Pad to send to BS Teoh (in progress)


WAFTECH # 2
Progress:
N/A

WAFTECH # 3
Progress: 
1. Install modified robot arm. Still have vacuum leak. The reading captured is -50kPa, the spec  -90+/-10 Kpa.  (done)

 
Old Pending:
1. New robot arm need to modify due to fabrication error. Still have vacuum leak.  -17 days ago