Inari attendance:
1. Alif (013-4063267)
2. Lokman Trainee (010-5614518
WAFTECH # 1
Progress:
WAFTECH # 3
Progress:
1. Bar code labeller wiring (done).
2. Test new robot arm, got problem on vacuum due to uneven surface. Remove back to waftech office to modify. (new pending)
3. Replace thermal release cup to new type (done)
1. Alif (013-4063267)
2. Lokman Trainee (010-5614518
Waftech attendance:
1. Chan Jr (018-9449917)
2. Khai (016-5078149)
2. Khai (016-5078149)
WAFTECH # 1
Progress:
1. Run 25 wafer, machine stop on wafer 16 due to "tape residue" having problem (not stick). During homing, the robot arm have rotate 360 Degree and caused all the wire twisted and disconnected (new pending)
WAFTECH # 2
Progress:
N/A. Stable already. UPH-30 wafers/hProgress:
WAFTECH # 3
Progress:
1. Bar code labeller wiring (done).
2. Test new robot arm, got problem on vacuum due to uneven surface. Remove back to waftech office to modify. (new pending)
3. Replace thermal release cup to new type (done)
Old Pending:
1. New robot arm need to modify due to fabrication error. -15 days ago
No comments:
Post a Comment