Thursday, 19 November 2015

Month 1 Day 6

Inari attendance:
1. Alif (013-4063267)
2. Lokman (010-5614518)

Waftech attendance: (half day)
1. Khai (016-5078149)

WAFTECH # 1
Progress:
N/A
 
Old Pending:
1. Cutting offset detected after the conversion, no permanent position to lock the cutter position. Need to test and test every-time conversion. To optimize the cutting angle by product (3 days ago)

WAFTECH # 2
Progress:
N/A

WAFTECH # 3
Progress:
N/A

Old Pending:
1. Alex to provide the timeline machine setup for waftech#3.(3 days ago)

Wednesday, 18 November 2015

Month 1 Day 5


Inari attendance:
1. Alif (013-4063267)
2. Lokman (010-5614518)
3. EB Pang



Waftech attendance: (half day)
1. Wee Khang
2. Khai (016-5078149)

WAFTECH # 1
Progress:
1. Run Cu pillar, detected a bit crack due to cutting problem.
 
Old Pending:
1. Cutting offset detected after the conversion, no permanent position to lock the cutter position. Need to test and test every-time conversion. To optimize the cutting angle by product (2 days ago)

WAFTECH # 2
Progress:
1. Run 1 Cu pillar, observed small bubble.

WAFTECH # 3
Progress:
1. Replace & installed UV detaper motor to 360 degree (done)

Old Pending:
1. Alex to provide the timeline machine setup for waftech#3.(2 day ago)
 
 

Tuesday, 17 November 2015

Month 1 Day 4

Inari attendance:
1. Alif (013-4063267)
2. Lokman (010-5614518)


Waftech attendance: (half day)
1. Chan Jr (018-9449917)
2. Khai (016-5078149)
3. SK Lim

WAFTECH # 1
Progress:
N/A
Old Pending:
1. Cutting offset detected after the blade  hit the saw line edge. To optimize the cutting angle (1 day ago)


WAFTECH # 2
Progress:
N/A

WAFTECH # 3
Progress:
N/A

Old Pending:
1. Replace UV detaper motor to 360 degree  (6 days ago)
2. Alex to provide the timeline machine setup for waftech#3.(1 day ago)


 

Monday, 16 November 2015

Month 1 Day 3

Inari attendance:
1. Alif (013-4063267)
2. Lokman (010-5614518)


Waftech attendance: (half day)
1. Chan Jr (018-9449917)
2. Khai (016-5078149)

WAFTECH # 1
Progress:
1. Test 20 sawn wafer Cu Pad dummy. Detected cutting problem, the blade stuck at edge's saw line wafer and cause the alignment of blade out. Awaiting optimization from Waftech (new pending)

WAFTECH # 2
Progress:
N/A

WAFTECH # 3
Progress:
1. Alex to provide the timeline machine setup for waftech#3.
 
Old Pending:
1. Replace UV detaper motor to 360 degree  (6 days ago)

Friday, 13 November 2015

Day 30

Inari attendance:

1. Alif (013-4063267)  -- Off to BG issue


Waftech attendance:
1. Chan Jr (018-9449917)
2. Khai (016-5078149)

WAFTECH # 1
Progress:
N/A

Old Pending:
 1. Avago replied, ask to test 20 sawn dummy wafer on Cu Pad. (1 days ago)

WAFTECH # 2
Progress:
1. Fix the issue on peeling Cu Pillar tape liner. (solved)


WAFTECH # 3
Progress:
1. New robot arm need to modify due to fabrication error. Still have vacuum leak (solved)
 
Old Pending:
1. Replace UV detaper motor to 360 degree  (3 days ago)

Thursday, 12 November 2015

Day 29

Inari attendance:
1. Alif (013-4063267)  -- Off to BG issue
2. Lokman (010-5614518)
3. EB Pang


Waftech attendance:
1. Chan Jr (018-9449917)
2. Khai (016-5078149)

WAFTECH # 1
Progress:
1. Run real 3 Cu Pillar wafer. (no issue)
2. Avago replied, ask to test 20 sawn dummy wafer on Cu Pad. (new pending)

WAFTECH # 2
Progress:
1. Run real 3 Cu Pillar wafer. Cannot peel the linear tape. During test the dummy (use Cu Pad dummy follow cu pillar process) is OK. Awaiting optimization tomorrow by waftech (new pending)


WAFTECH # 3
Progress:
N/A
 
Old Pending:
1. New robot arm need to modify due to fabrication error. Still have vacuum leak.  -23 days ago
1. Replace UV detaper motor to 360 degree  (3 days ago)

Wednesday, 11 November 2015

Day 28

Inari attendance:
N/A (awaiting uv tape)


Waftech attendance:
N/A

WAFTECH # 1
Progress:
1. Awaiting new UV tape.


WAFTECH # 2
Progress:
N/A


WAFTECH # 3
Progress: 
N/A

Old Pending:
1. New robot arm need to modify due to fabrication error. Still have vacuum leak.  -22 days ago
1. Replace UV detaper motor to 360 degree  (2 days ago)